Mining productivity (research): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
(Tested the rate at which mining drills (EMD, BMD...) can feed belts and found that even with the layout shown in the figure, it is capped at 1/2 the rate of the belt.) |
||
Line 17: | Line 17: | ||
== Output of electric mining drills == | == Output of electric mining drills == | ||
[[File:Full belt miner.gif|thumb|right|At mining productivity 350, a single electric mining drill can fill a blue belt]] | [[File:Full belt miner.gif|thumb|right|At mining productivity 350, a single electric mining drill can fill a blue belt. (Note: As of the Space Age DLC, mining drills are limited to feeding at a rate of 1/2 the rate supported by the belt.)]] | ||
{| class="wikitable" | {| class="wikitable" |
Latest revision as of 05:16, 21 December 2024
Mining productivity |
Cost |
|
✖ 250 | |
Prototype type |
|
Internal name |
mining-productivity-1 |
Required technologies |
|
Allows |
|
Mining productivity is a research that increases the resource output of mining drills and pumpjacks by 10% per level. Unlike productivity from productivity modules, there are no downsides. Any ore that is produced by the productivity bonus is free; it does not deplete the resource under the miner.
Technology | Cost | Effects | Cumulative effect |
---|---|---|---|
Mining productivity 1 | ✖ 250 | 10% | 10% |
Mining productivity 2 | ✖ 500 | 10% | 20% |
Mining productivity 3 | ✖ 1000 | 10% | 30% |
Mining productivity 4-∞ | (eg. 2500 for level 4, 5000 for level 5) |
✖ 2500*(Level-3) 10% per level | 30% + 10%*(Level-3) |
Output of electric mining drills
Mining productivity level | Number of Speed module 3 | Express transport belt |
---|---|---|
26 | 3 | 0.1 |
35 | 3 | 0.125 |
50 | 3 | 0.166 |
62 | 3 | 0.2 |
80 | 3 | 0.25 |
110 | 3 | 0.333 |
170 | 3 | 0.5 |
215 | 0 | 0.25 |
350 | 3 | 1 |
440 | 0 | 0.5 |
890 | 0 | 1 |