In other languages: Deutsch Français Italiano 日本語 한국어 Nederlands Polski Português, Brasil Русский Українська 简体中文

Mining

From Official Factorio Wiki
Revision as of 09:42, 23 November 2014 by Ssilk (talk | contribs) (→‎See also)
Jump to navigation Jump to search

Mining drills are used to automate the extraction of resources. Drills are the first step to automate manufaction, although most resources have to be smelted in a furnace for further usage.


Mining Speed Formula

Metal and mineral resources have a "mining hardness" rating. The rate at which they are produced is given by:

(Mining power - Mining hardness) * Speed / Mining Time = production rate (in resource/s)

Mining power and speed are functions of the miner while hardness and time are functions of the metal or mineral.

Drill types

Item Total raw Mining power Mining speed Max power Covered area
Burner mining drill
Stone.png
5
2.5 0.35 300 kW (burner) 2 x 2
Electric mining drill 3 0.5 90 kW (electric) 5 x 5

Note, that the Burner mining drill covers exactly its size (2x2, and so covered area is also just 2x2), while the Electric mining drill is one tile bigger (size is 3x3, but covered area is 5x5). Place Electric mining drills in the centre of resource-fields as narrow as possible, but at the borders of the field, more loosely to get a more continuous throughput by having more equal resources per miner.

Output

Unlike most other equipment, mining drills will output resources directly without the need of inserters. This includes Transport belts, Chests, other mining drills (makes only sense for Burner mining drill), Furnaces, Assembling machines etc.

File:Mpstark-75D1NiH.gif File:Mpstark-C9VYEfv.jpg

See also