Electric mining drill: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
m FatMcK moved page Electric mining drill to Electric Mining Drill: upper/lower case correction  | 
				No edit summary  | 
				||
| Line 1: | Line 1: | ||
{{Machinery  | {{Languages}}  | ||
{{Machinery/sandbox  | |||
|image=Electric-Mining-Drill-Example  | |||
|image=Electric-Mining-Drill-Example  | |||
|health=300  | |health=300  | ||
|energy=90 kW   | |energy=90 kW electric  | ||
|miningspeed=0.5   | |miningpower=3  | ||
|miningarea=  | |miningspeed=0.5  | ||
|miningarea=5  | |||
|pollution=9  | |pollution=9  | ||
|  | |modules=3  | ||
|raw=  | |input=Time, 2 + Iron Plate, 10 + Iron Gear Wheel, 5 + Electronic Circuit, 3  | ||
|producers=  | |raw=Time, 8.3 + Iron Plate, 23 + Copper Plate, 4.5  | ||
|producers=Manual + Assembling machine 2 + Assembling machine 3  | |||
}}  | }}  | ||
The [[Electric mining drill]] mines out [[Iron ore]], [[Copper ore]], [[Stone]] and/or [[Coal]], and places it in front of the output tile, on a conveyor or in a machine/chest that covers the output tile.  | The [[Electric mining drill]] mines out [[Iron ore]], [[Copper ore]], [[Stone]] and/or [[Coal]], and places it in front of the output tile, on a conveyor or in a machine/chest that covers the output tile.  | ||
| Line 21: | Line 22: | ||
* [[Electric network]]  | * [[Electric network]]  | ||
{{MachineNav}}  | {{MachineNav}}  | ||
{{C|Items}}  | |||
{{C|Electric network}}  | |||
{{C|Crafting network}}  | |||
Revision as of 14:01, 21 October 2014
Template:Machinery/sandbox The Electric mining drill mines out Iron ore, Copper ore, Stone and/or Coal, and places it in front of the output tile, on a conveyor or in a machine/chest that covers the output tile.
The machine is 3x3, but mines in a 5x5 area, extending 1 tile away on each side. Mines copper, iron and coal at a rate of 0.525/s and stone at a rate of 0.65/s