Infobox:Automated rail transportation (research): Difference between revisions
Jump to navigation
Jump to search
m (BilkaBot moved page Automated rail transportation (research)/infobox to Infobox:Automated rail transportation (research) without leaving a redirect: New infobox organization.) |
(Updated cost to 0.17.0.) |
||
Line 4: | Line 4: | ||
|expensive-cost-multiplier = 300 | |expensive-cost-multiplier = 300 | ||
| category = Technology | | category = Technology | ||
| cost | |cost = Time, 30 + Automation science pack, 1 + Logistic science pack, 1 | ||
| cost-multiplier = 75 | | cost-multiplier = 75 | ||
| required-technologies = Railway | | required-technologies = Railway |
Revision as of 17:33, 26 February 2019
Automated rail transportation |
Cost |
|
✖ 75 | |
Enables building of train stations, these can be used to setup automated train routes. |
|
Prototype type |
|
Internal name |
automated-rail-transportation |
Required technologies |
|
Allows |
|
Effects |
|