In other languages: Español 简体中文

Curved rail

From Official Factorio Wiki
Revision as of 12:35, 17 August 2017 by Bilka (talk | contribs) (Category overhaul)
Jump to navigation Jump to search
Time.png
Curved rail has been archived.
The information on this page pertains to a previous version of the game.
It may be incorrect, or concern a removed/changed feature.

MAINTAINER NOTE: As of version 0.13, curved rails can no longer be constructed. See rail planner for the updated way to place rails.

Curved rail.png
Curved rail

Recipe

Time.png
0.5
+
Stone.png
4
+
Iron stick.png
4
+
Steel plate.png
4
Curved rail.png
2

Total raw

Time.png
1.5
+
Stone.png
4
+
Iron plate.png
2
+
Steel plate.png
4

Health

200

Required technologies

Railway (research).png

Produced by

Player.png
Assembling machine 2.png
Assembling machine 3.png

A Curved rail element is used for building a track for trains in a Railway network. One element covers 1/8 of a full circle. Rotation enables building of all needed orientations.

Optimal time/item usage: 1 Iron stick factory → 1 Curved rail factory.

Turns

Curved-rail-example-1.png

To build a 90 degree turn 2 Curved rails and 1 Straight rail are needed. The Straight rail has to be placed in diagonal orientation to fill in the gap between the two Curved rails.

See also