Talk:Railway network: Difference between revisions
Jump to navigation
Jump to search
(Created page with "this sentence is not understandable: Rail signals can be built only next to the END of the rail. This means there are at most 4 signals per rail (2 at each end). ~~~~") |
(No difference)
|